Canada Transit Atlas

TransLink 407 Gilbert/Bridgeport on Friday, November 20, 2026

‹ Thu, Nov 19 Sat, Nov 21 › Every route this day 407 Gilbert/Bridgeport schedule and stops Replay the day on the map

Stops run down the side, Steveston Exchange @ Bay 3 at the top, spaced by distance; time runs across. Each line is one trip.

46 trips scheduled to start between 4:00 a.m. and 2:00 a.m.: 45 seen running, 1 missing or cancelled. 22 reached their last stop seen 5 or more minutes late.

Missing or cancelled: 2:21 p.m.

Steep lines are slow running; lines that touch are buses bunched together. Tap or hover a line for that trip.