TransLink 145 SFU Exchange/Production Station on Wednesday, November 11, 2026
‹ Tue, Nov 10 Thu, Nov 12 › Every route this day 145 SFU Exchange/Production Station schedule and stops Replay the day on the map
Stops run down the side, Production Way Station @ Bay 1 at the top, spaced by distance; time runs across. Each line is one trip.
54 trips scheduled to start between 7:00 a.m. and 1:00 a.m.: 47 seen running, 7 missing or cancelled. 47 reached their last stop seen 5 or more minutes late.
Missing or cancelled: 11:20 a.m., 12:06 p.m., 12:51 p.m., 1:35 p.m., 2:20 p.m., 3:05 p.m., 5:05 p.m.
Steep lines are slow running; lines that touch are buses bunched together. Tap or hover a line for that trip.