TransLink 145 SFU Exchange/Production Station on Friday, November 6, 2026
‹ Thu, Nov 5 Sat, Nov 7 › Every route this day 145 SFU Exchange/Production Station schedule and stops Replay the day on the map
Stops run down the side, Production Way Station @ Bay 1 at the top, spaced by distance; time runs across. Each line is one trip.
114 trips scheduled to start between 5:00 a.m. and 2:00 a.m.: 109 seen running, 5 missing or cancelled. 99 reached their last stop seen 5 or more minutes late.
Steep lines are slow running; lines that touch are buses bunched together. Tap or hover a line for that trip.