Canada Transit Atlas

TransLink 509 Walnut Grove/Surrey Central Station on Monday, November 2, 2026

‹ Sun, Nov 1 Tue, Nov 3 › Every route this day 509 Walnut Grove/Surrey Central Station schedule and stops Replay the day on the map

Stops run down the side, Carvolth Exchange @ Bay 11 at the top, spaced by distance; time runs across. Each line is one trip.

12 trips scheduled to start between 7:00 a.m. and 7:00 p.m.: 11 seen running, 1 missing or cancelled. 3 reached their last stop seen 5 or more minutes late.

Missing or cancelled: 4:01 p.m.

Steep lines are slow running; lines that touch are buses bunched together. Tap or hover a line for that trip.